ROAD REALIGNMENT PROJECT ALONG DRY CREEK ROAD

The city and contractor, HT4 Construction, are working to realign a small portion of Dry Creek Road, as shown in the map to the left. This work is being done in conjunction with a shared-use path that is being constructed along the west side of Dry Creek Road, between Two Fence Trail and Thunder Mountain Road. The road realignment will allow the pathway to stay within the city’s right of way and is necessary for the pathway project to move forward.

Roadway realignment work consists of the removal and replacement of the existing asphalt, brush and tree removals, drainage improvements, roadway striping, and the installation of rock, handrails and signage. The roadway alignment project is scheduled to be completed by the Thanksgiving holiday, with additional shared-use pathway work to follow.

Traffic Impacts

One lane of traffic will be open, with a temporary traffic signal in place. Please be aware of construction equipment, lane restrictions, reduced speeds, rough road conditions and loud noise along Dry Creek Road. Motorists should anticipate short delays and allocate extra time when traveling through the project corridor. Crews will work with residents to maintain driveway access throughout construction operations.